Sunbeam New Energy

홈페이지> 블로그> The first unit of the underground power station of the Three Gorges Water Control Project is connected to the grid for power generation

The first unit of the underground power station of the Three Gorges Water Control Project is connected to the grid for power generation

February 20, 2023
After nearly 10 years of construction, the world’s largest water conservancy project, the first unit of the underground power station of the Three Gorges Water Control Project, was formally connected to the grid at 2:00 pm on the 23rd.

According to the introduction of the director of the operation department of the Three Gorges Power Station to the Division, this action achieved a “zero breakthrough” in the Chinese Yangtze River abandoned water power generation.

The Three Gorges Project is divided into three phases. The total construction period is 17 years. It was completed in 2009. The Three Gorges Reservoir can store 175 meters of water.

The Three Gorges Underground Power Station designed and installed six sets of 700,000-kilowatt mixed-flow turbine-generator units with a total installed capacity of 4.2 million kilowatts and a designed annual power generation of 3.511 billion kwh.

문의하기

Author:

Ms. LISA CHEN

이메일:

Lisa@ie-energy.com

Phone/WhatsApp:

+86+8613537343431

인기 상품
You may also like
Related Categories

이 업체에게 이메일로 보내기

제목:
이메일:
메시지:

Your message must be betwwen 20-8000 characters

모바일 사이트

홈페이지

Product

Phone

우리에 대해

문의

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

송신